NEW Shams 400KV Transmission Line
About Project
Geo-Leaders was selected to provide expert consultation and conduct a thorough review of the pile design and execution for the New Shams 400KV transmission line project. The primary objective of this engagement was to ensure that the pile design and installation process adhered to the specific requirements outlined by M/S DEWA (Dubai Electricity and Water Authority), in strict compliance with their detailed specifications and project limitations. Geo-Leaders’ role included evaluating the proposed design’s structural integrity, geotechnical considerations, and overall feasibility, ensuring that all aspects of the foundation system met DEWA’s rigorous standards. Additionally, the team worked closely with the project engineers and contractors to offer guidance throughout the execution phase, monitoring progress and making adjustments as necessary to maintain alignment with DEWA’s safety protocols, quality expectations, and regulatory standards. Through this collaboration, Geo-Leaders ensured that the pile foundations for the transmission line were designed and implemented efficiently, with an emphasis on long-term stability and reliability for the critical infrastructure.