2 Villas (B+G+1) Green Scape contracting At Umm Suqeim.
About Project
Shoring Works consist of secant piles and I-Beam sections was utilized to insure basement vertical excavation safety Shoring works for the project were designed to ensure the safety and stability of the basement vertical excavation throughout the construction process. To achieve this, a combination of secant piles and I-beam sections was utilized. Secant piles, which are interlocking reinforced concrete elements, were installed to form a strong, continuous barrier around the excavation site, preventing soil movement and protecting adjacent structures. In addition, I-beam sections were strategically placed to provide further structural support and enhance the integrity of the excavation. Together, these methods were implemented to create a secure and safe environment, effectively minimizing the risk of collapse or instability during the excavation and foundation works. This dual approach of using secant piles and I-beams helped ensure that the vertical excavation was completed without compromising the safety of workers or the surrounding area.