2 Villas (B+G+1) Green Scape contracting At Umm Suqeim.

About Project

Shoring Works consist of secant piles and I-Beam sections was utilized to insure basement vertical excavation safety Shoring works for the project were designed to ensure the safety and stability of the basement vertical excavation throughout the construction process. To achieve this, a combination of secant piles and I-beam sections was utilized. Secant piles, which are interlocking reinforced concrete elements, were installed to form a strong, continuous barrier around the excavation site, preventing soil movement and protecting adjacent structures. In addition, I-beam sections were strategically placed to provide further structural support and enhance the integrity of the excavation. Together, these methods were implemented to create a secure and safe environment, effectively minimizing the risk of collapse or instability during the excavation and foundation works. This dual approach of using secant piles and I-beams helped ensure that the vertical excavation was completed without compromising the safety of workers or the surrounding area.
x
Geo Leaders construction

Geo – Leaders Piling and Foundation Contracting was established to provide specialized geotechnical services in the construction industry. With a focus on piling, drilling, and various shoring systems, we have built a reputation for delivering reliable and innovative solutions tailored to the unique challenges of each project. Leveraging years of experience and cutting-edge technology, GEO-Leaders has quickly become a trusted name in the industry, known for its commitment to quality and excellence in foundation and soil improvement works.
contact us

Address: Jabil Ali – Dubai – UAE

Call Us: +971 55 774 5783

Mail: Geoleaders.uae@gmail.com

Open Hour: 8.00 Am – 17.00 Pm

x

Request A Quote

Send us a message and we will reply you within 3 hours by email.